Oilfield access

Prepared for the gate before the asset moves.

Beduara coordinates the equipment and personnel records needed for controlled energy sites, with requirements mapped to the project, sponsor and facility.

Illuminated oil and gas refinery complex at night

Abu Dhabi projects

CICPA access is scope specific.

CICPA protected sites require sponsored access for named personnel and vehicles. Validity and facility coverage can differ, so each mobilisation begins with the exact site and sponsor process.

Confirm facility

Identify the field, plant, operating company and main contractor.

Confirm sponsor

Review the LOA, NOC or project access route provided by the authorised sponsor.

Prepare records

Compile vehicle, equipment, personnel and inspection documentation.

Track approval

Coordinate submission status, expiry dates and mobilisation sequencing.

Typical mobilisation file

What the project team may request.

The final list comes from the client or main contractor. Beduara organises available records and closes the gaps before the planned start date.

01

Company file

Trade licence, contract or PO support, insurance and sponsor documentation.

02

Asset file

Registration, insurance, inspection, load test and maintenance records.

03

Personnel file

Identity, licence, competency, medical and training documentation.

04

Site file

Induction, RAMS, lifting plans, HSE forms and named permit requirements.

Saudi Arabia

Support for Aramco facing project scopes.

For Saudi oil and gas projects, we build the supply package around the awarded contractor's requirements, mobilisation location and applicable vendor or site approval process.

Equipment and personnel can be proposed for project review with relevant third party documentation. Any Saudi Aramco approval, vendor registration or specific site acceptance is stated only when confirmed for the named contract.

  • Scope based fleet proposal
    Capacity, configuration, age requirement and inspection status.
  • Personnel competency files
    Operator, rigger, supervisor and driver records for review.
  • Cross border planning
    Mobilisation route, customs and temporary import coordination where applicable.
  • Local supply coordination
    Regional sourcing and project partner support for Saudi deployment.

References to ADNOC, CICPA and Saudi Aramco describe target project environments and required processes. They do not by themselves state endorsement or unrestricted approval.

Tell us the facility, sponsor and required start date.

Plan mobilisation →